Freightify secures $12M funding round to power digital transformation for freight forwarders globally - 21 hours ago
-
Be for Beauty company behind The INKEY List, scales up demand planning processes with FuturMaster - 21 hours ago
-
APPLIED DRIVING PARTNERS WITH SURECAM - 2 days ago
-
Caster Concepts breaks ground on $2 million expansion at its Central Michigan headquarters - January 31, 2023
-
NULOGY’S SOFTWARE A ‘MUST SEE’ FOR CONTRACT PACKERS AT THIS YEAR’S PACKAGING INNOVATIONS SHOW - January 31, 2023
-
LEEA schedules essential end user watching for 2023 - January 30, 2023
-
Narrow Aisle announces board restructure and significant appointment to its leadership team - January 30, 2023
-
Why cleanliness is key to a good operating warehouse - January 27, 2023
-
VISIONTRACK SEES GROWING DEMAND FOR VIDEO TELEMATICS - January 27, 2023
-
Energy Predictions for 2023: On-site generation, energy optimisation and a renewed commitment to net-zero are key in 2023 - January 26, 2023
Twintec – Superflat Flooring Specialists.
VNA racking requires a very flat floor to operate efficiently and safely. All too often warehouse floors are constructed and then require extensive grinding within the aisles to achieve the flatness tolerance specified.
Twintec will design and construct a DM1 floor slab to tolerance maintaining all the advantages of a large panel ‘jointless’ SFRC floor slab. Twintec’s competence was recently demonstrated at a new logistics facility in Qatar where the independent DM1 flatness survey reports an overall 99.4% compliance with the required specification, making it the flattest large panel ‘jointless’ floor slab in the GCC. The project has 18m high racking and floor panel sizes up to 32.6m x 32.5m. Twintec designed and constructed the floor slab utilising high tensile strength steel fibres, with no saw-cut joints and no remedial grinding required.
This would be impossible for general contractors even with ‘expert’ supervision and remains challenging for specialist flooring contractors, generally necessitating substantial remedial grinding within the aisles to meet the MHE operational standards.
Twintec’s Commercial Director, Tom Menary, said “There are key critical success factors to constructing a DM1 large panel ‘jointless’ floor slab. These include highly skilled and experienced workers on site, precision in-house developed machinery and robust quality control processes. The role of other parties on site is key also with a strictly controlled and prepared working environment for the floor slab construction and the correct concrete mix design, delivery and quality. Twintec takes total responsibility for the floor slab offering a clearly defined Design-Build-Guarantee service that removes any split responsibility”.
Twintec has a long-standing track record of designing and constructing high tolerance floor slabs worldwide, including a recent DM1 project in Oman.
With logistics technology rapidly evolving, and racking continuing to get higher, logistics operators will need to consider the demands that will be placed on the floor more closely and consider the benefits of working with a specialist flooring contractor to meet their flatness needs. www.twintecgroup.com